Back to homepage

Success Stories

MetalWest

Saving $200K/year and Doubling Capacity

Founder Mick Douthie brought in Smart Shop Floor's AI Estimator and Scheduler to take the manual work out of estimating and scheduling at MetalWest, a WA structural and infrastructure fabricator with 18 staff and two decades of experience. By automating two office admin roles, MetalWest saved roughly $200,000 a year in labour, cut quote turnaround time by more than half and doubled workshop capacity. Mick can now quote a job from his phone on site instead of losing a day at his desk.

Results as reported by MetalWest.

Schlam Payload

From Too Many Tools to Real-Time Scheduling Answers

Schlam builds mining truck bodies for just-in-time delivery. As their workforce grew around 40% and their footprint around 50%, their digital tools couldn't keep up and slow manual follow-up was draining production hours. Smart Shop Floor's automated scheduling gives them real-time visibility across their operations. They now track material usage and job progress in real time, respond immediately to system alerts, and report improved lead times.

Growth figures are business context, not results of the software.

Customer Stories

Watch Their Transformations

A.D. Coote & Co.

Production Supervisors Demonstrate Scheduling in Action

A walkthrough of the operator board, tablet use at the work centre, downtime logging and shop floor messaging.

Published 6 December 2025

A.D. Coote & Co.

A.D. Coote & Co. customer story

Customer story video. The description reports managers and operators each save multiple hours daily.

Published 28 April 2025

MetalWest

Full Production Transparency Across the Shop Floor

An earlier MetalWest video on production transparency, covering quality checkpoints and the customer portal.

Published 29 November 2024

R. Moore and Sons

R. Moore and Sons: from manual scheduling to automated control

R. Moore and Sons on scheduling, managing complexity, maintenance and the customer portal.

Specialised Tyre and Wheel

Specialised Tyre and Wheel: lead times from 8 weeks to 2

STW describes lead time changes, bills of materials, capacity planning and the customer portal.

Published 2 December 2024

Detailed Case Studies

Each story summarises what the customer reported, how they use Smart Shop Floor, and links to the original video or document.

More Smart Shop Floor Customers

Other Australian businesses using Smart Shop Floor.

  • Vekta Automation
  • World Wide Truss
  • K-Drive
  • Sterling Pumps
  • United Pumps
  • Better wear Welding
  • Goldmont Engineering
  • Tasocs
  • Isenring Motors & Pumps
  • ACC Higgins

The shop floor scheduling solution that gets the job done.

We bring together everything you need to schedule and manage your shop floor. Save time, reduce downtime, and boost productivity.

Book a demo